Projects

Construction of the overground and underground infrastructure with the mining shaft hoist of the Janina VI shaft

  • Sector: Designing
  • Status: completed
  • Period of completion: 2018-2021
  • Client: Mostostal Zabrze Gliwickie Przedsiębiorstwo Budownictwa Przemysłowego S.A.
  • Location: Libiąż

Multi-discipline design documentation for the task: “Construction of the overground and underground infrastructure with the mining shaft hoist of the Janina VI shaft” in the scope of design for obtaining a building permit, preparation of detailed engineering, as-built documentation and author’s supervision.
Investor: Tauron Wydobycie S.A.