Multi-discipline design documentation for the task: “Construction of the overground and underground infrastructure with the mining shaft hoist of the Janina VI shaft” in the scope of design for obtaining a building permit, preparation of detailed engineering, as-built documentation and author’s supervision.
Investor: Tauron Wydobycie S.A.