Projects

Construction of the biomass installation for Heat Power Plant boilers.

  • Sector: Designing
  • Status: completed
  • Period of completion: 2012-2013
  • Client: Mostostal Zabrze S.A.
  • Location: Białystok

Construction of the biomass installation for Heat Power Plant boilers. Designing of reception, storage and feeding of “agro” biomass fuel to boilers in Białystok Heat and Power Plant. Preparation of building permit design and detailed design.
Investor: Elektrociepłownia Białystok S.A.