Projects

Process installation for catalysts production of mobile NOx system reduction

  • Sector: Designing
  • Status: completed
  • Period of completion: 2013-2015
  • Client: Mostostal Zabrze S.A.
  • Location: Środa Śląska

Development of documentation for the task: „Process installation for catalysts production of mobile NOx system reduction”.
Investor: BASF Polska Sp. z o.o.